Brenneman Solar

Solar project, Georgia

Goonies Solar

Solar energy

Brenneman Solar

The Brenneman project is the first one that Doral LLC acquired. All the necessary landowners have signed onto this project, and all the necessary construction permits and feasibility studies have been obtained.

The project’s acquisition was completed at the end of 2021. Brenneman is expected to produce about 175 megawatts of green electricity, and it is expected to be commercially operational in 2024.

175 MWp
Capacity
SERC
Electrical grid
1,480
Acres

Contact us